Place of Origin: | China |
---|---|
Brand Name: | Saibo |
Certification: | CE/ISO |
Model Number: | Double Row |
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Suitable for ocean shipment |
Delivery Time: | 70 working days after received deposit |
Payment Terms: | T/T, L/C |
Supply Ability: | 300 sets per year |
Product Name: | Montantes Double Row Roll Forming Machine | Power: | 11KW+7.5w With Fan System+2.9kw Servo Power |
---|---|---|---|
Size Of Purlin: | Double Row | Steel Thickness: | 0.3-0.6mm |
Decoiler: | Manual Or Hydraulic | Station: | 13 Stations + One Station For Rectify |
Roller Material: | 45# Forge Steel, Surface With Chrome | Drive: | By Chain |
Highlight: | Metal Stud Roll Forming Machine,Stud Roll Forming Machine |
1. Components of machine:
|
Decoiler | 1set |
|
Flatten device | 1set |
|
Servo feeding and punching system | 1set |
|
Main roll forming machine | 1set |
|
Hydraulic cutting system | 1set |
|
Controlling system | 1set |
|
Run out table | 1set |
2. Specification of the material
1 | Suitable Material | GI, 300Mpa |
2 | Width of the raw material | According to the final profile |
3 | Thickness | 0.3-0.6mm |
3. Machine Detailed Parameters
1 | Roll Forming
|
Montantes Double Row Roll Forming Machine
|
2 | Machine structure
|
Wire-electrode cutting structure |
3 | Total power |
Motor power-11kw |
4 | Roller stations |
|
5 |
Productivity |
About 25m/min for forming Include punching and cutting, about 12m/min |
6 |
Drive system |
By chain |
7 |
Diameter of shaft |
¢56mm solid shaft |
8 |
Servo motor |
3kw |
9 |
Voltage |
380V 50Hz 3phases (Customized) |
10 |
Color Of The Machine |
Yellow and blue |
11 |
Deliver Time |
70 days |
12 |
Terms Of Payment |
30%T/T 70% pay before shipment |
4. Profile drawing
Profile 1:
Profile 2:
Joint
Punching for 69mm profile only
5. The Chart of Process Flow
6. Specification of Components
(1) 3T Manual Un-coiler
(2) Flatten
(3) Servo feeding& punching system
(4) Main Roll Forming Machine
(5) Rectify device
(6) Track cutting system
(7) Computer Control Cabinet
Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and video to teach you to install and operate
.
C.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
After Service
a.One year guarantee for whole machine.
b.24 hours technical support by email or calling
c.If there is any problem found of the machine, we will repair it for free in one year.