Place of Origin: | China |
---|---|
Brand Name: | Saibo |
Certification: | CE/ISO |
Model Number: | YX51-60 |
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Suitable for ocean shipment |
Delivery Time: | 70 working days after received deposit |
Payment Terms: | T/T, L/C |
Supply Ability: | 300 sets per year |
Product Name: | Fencing Frame Roll Forming Machine | Hydraulic Power: | 5.5kw |
---|---|---|---|
Steel Thickness: | 0.4-0.8mm | Decoiler: | Manual |
Station: | 17 Stations | Roller Material: | Gcr15 |
Structure: | Steel Plate Welding | Drive: | By Chain |
High Light: | Metal Stud Roll Forming Machine,Stud Roll Forming Machine |
YX51-60 Stud Roll Forming Machine Australia standard fencing frame 40GP container
1. Specification of the material
1 | Suitable Material | Galvanized steel, PPGI |
2 | Width of the raw material | 169mm |
3 | Thickness | 0.4-0.8mm |
2. Machine Detailed Parameters
Roll Forming
|
Fencing frame roll forming machine
|
Machine structure
|
Wire-electrode cutting structure |
Total power |
Motor power-5.5kw Hydraulic power-4kw |
Roller stations |
about 17 stations |
Productivity
|
0-15m/min |
Drive system
|
By chain |
Diameter of shaft
|
¢56mm solid shaft |
Voltage
|
380V 50HZ, 3 PHASE |
Color Of The Machine
|
Yellow and blue |
Deliver Time
|
70 days |
Terms Of Payment
|
30%T/T 70% pay before shipment |
3. Profile drawing
4. The Chart of Process Flow
5. Specification of Components
(1) 3T Manual Un-coiler
(2) Main Roll Forming Machine
(3) Hydraulic cutting system
(4) Computer Control Cabinet
6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.