| Place of Origin: | China | 
|---|---|
| Brand Name: | Saibo | 
| Certification: | CE/IS09001/SGS | 
| Minimum Order Quantity: | 1 set | 
| Price: | negotiable | 
| Packaging Details: | Suitable for ocean shipment | 
| Delivery Time: | 60 working days after received deposit | 
| Payment Terms: | L/C, T/T, Western Union | 
| Supply Ability: | 350 sets per year | 
| Roller Material: | ASTM1045 Chrome Plated Surface With Chrome | Station: | 14 Stations( According To The Final Design) | 
|---|---|---|---|
| Drive: | By Chain, 1.0inch | Steel Thickness: | 0.4-0.8mm | 
| Power: | 4kw+3kw | Coil Width: | According To The Final Profile | 
| Working Speed: | 0-15m/min | Color: | Bule And Yellow | 
| Highlight: | c channel roll forming machine,corrugated sheet roll forming machine | ||
Shutter Roll Forming Machine
| No | Specification of the material | |
| 1 
 | Suitable Material | Galvanized steel | 
| 2 
 | Width of the raw material | According the profile | 
| 3 | Thickness | 0.4-0.8mm | 
Layout:

Manual de-coiler—Feeding—Roll Forming—Cutting—Out table
Machine Detailed Parameters
| 1 | Machine structure | Wire-electrode cutting structure | 
| 2 | Total power | Motor power-4kw Hydraulic power-3kw | 
| 3 | Roller stations | About 14 stations + one station for rectify (according the final design) | 
| 4 | Productivity | 0-15m/min | 
| 5 | Drive system | By 1.0 inch single chain | 
| 6 | Diameter of shaft | ¢56mm solid shaft | 
| 7 
 | Voltage | 380V 50Hz 3phases (Customized) | 
| 8 
 | Container need | 20GP container | 
Specification of Components
| No | Technical Specification & Remark | |
| 1 | Manual Uncoiler 
 | 
 
 | 
| 2 | Main Roll Forming Machine 
 | 
 | 
| 3 | Machine structure: 
 | 
 | 
| 4 | Hydraulic cutting system 
 | 
 | 
| 5 | Hydraulic System 
 | 
 
 
 
 
 
 
 
 | 
| 6 | Computer Control Cabinet 
 | 
 
 | 
| 7 | Out table 
 | 
 | 
| 8 | Spare Parts 
 | 
 | 
Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.