Place of Origin: | China |
---|---|
Brand Name: | Saibo |
Certification: | CE/IS09001/SGS |
Model Number: | Gutter roll forming machine |
Minimum Order Quantity: | 1 set |
Price: | negotiable |
Packaging Details: | Suitable for ocean shipment |
Delivery Time: | 50 working days after received deposit |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 410 sets per year |
Shaft: | ¢70mm | Steel Thickness: | 0.4-0.6mm |
---|---|---|---|
Suitable Material: | Colored Steel G275-G550 | Power: | 7.5KW+5.5KW |
Roller Material: | SAE1045 Steel With Chrome | Station: | About 18 Stations |
Drive: | By Chain | ||
High Light: | roof tile roll forming machine,metal roof forming machine |
Post cutting Pre engineering buliding forming machine 20m/min Drive by chain
Specifications:
Item NO |
Description |
Offered specification |
1 | Roll Forming Machine |
Gutter
|
2 | Coil width | Base on final profile |
3 | Rolling Speed | 20m/min(not include cutting time) |
4 | Rolling Thickness | 0.4-0.6mm Color steel |
5 | Control System | PLC (Panasonic) as list in the note |
6 | Un Coiler | 3T manual |
7 | Feeding | Adjustable type |
8 | Roller Stations | About 18 stations |
9 | Roller Material | 45# forge steel |
10 | Shaft Material and DIA | ¢70mm |
11 | Post cutting | Hydraulic cutting after forming |
12 | Maim Motor Power | 7.5kw |
13 | Hydraulic Station Power | 5.5kw |
14 | Hydraulic Pressure | 10-12Mpa adjustable |
15 | Material Of Cutting | Cr12,quenching 58-62℃ |
16 | Structure Of The Stations | Wall panel |
17 | Tolerance | 3m+-1.5mm |
18 | Electric Source |
According to customer’s require |
19 | Way Of Drive | By chain |
20 | Color Of The Machine | Yellow and blue |
Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
Installation and training
a. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b. Without visiting, we will send you user manual and video to teach you to install and operate.
C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
1) Q: Are you manufacturer or trading company?
A: We are manufacturer and trading company .
2) Q: Do you provide installing and training overseas?
A: Overseas machine install and worker training services are optional.
3) Q: How is your after sales support?
A: We provide technical support on line as well as overseas services by skillful technicians.
4) Q: How does your factory do regarding quality control?
A: There is no tolerance regarding quality control. Quality control complies with ISO9001. Every machine has to past testing running before it's packed for shipment.
5) How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) We welcome you visit us and test machine by yourself in our factory.
6) Q: Do you have this roof panel roll forming machine in stock?
A: No, machine is made to order.