Place of Origin: | China |
---|---|
Brand Name: | Saibo |
Certification: | CE/IS09001/SGS |
Model Number: | Gutter roll forming machine |
Minimum Order Quantity: | 1 set |
Price: | negotiable |
Packaging Details: | Suitable for ocean shipment |
Delivery Time: | 50 working days after received deposit |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 410 sets per year |
Shaft: | ¢70mm Silid Shaft | Steel Thickness: | 0.4-0.6mm |
---|---|---|---|
Main Power: | 7.5KW | Roller Material: | SAE1045 Steel With Chrome |
Station: | 18 Stations | Cutter Material: | Cr12 |
Voltage: | 440V, 60HZ, 3Phase | ||
Highlight: | roof tile roll forming machine,roof panel roll forming machine |
7.5kw main power Pre engineering buliding forming machine 18stations G550
Gutter Roll Forming Machine
Profile:
Layout:
Manual de-coiler—Pre-cutting—Feeding—Roll Forming—Cutting—Out table
Specifications:
Description |
Offered specification |
Roll Forming Machine |
Gutter roll forming machine
|
Rolling Speed | 20m/min |
Rolling Thickness | 0.4-0.6mm Color steel, G275-G550 |
Un Coiler | 3T manual or hydraulic decoiler |
Roller Stations | About 18 stations (according the final design) |
Roller Material | 45# forge steel, coated with chrome |
Shaft Material and DIA | ¢70mm, material is 45# forge steel |
Post cutting | Hydraulic cutting after forming |
Maim Motor Power | 7.5kw |
Hydraulic Station Power | 5.5kw |
Hydraulic Pressure | 10-12Mpa adjustable |
Material Of Cutting | Cr12,quenching 58-62℃ |
Structure Of The Stations | Wall panel |
Tolerance | 3m+-1.5mm |
Electric Source |
440V, 60HZ,3 phase According to customer’s require
|
Way Of Drive | By chain |
Color Of The Machine | Yellow and blue |
Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
Installation and training
a. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b. Without visiting, we will send you user manual and video to teach you to install and operate.
C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.